MISSION STATEMENT
To provide for effective administration of Public Works activities that ensures safe and efficient
storm drain systems and to ensure that all City public drainage improvements are designed and
constructed in accordance with City regulations and accepted engineering and construction
principles and practices.
DIVISION DESCRIPTION
The Engineering Division of the Public Works Department is responsible for the overall
engineering and construction of streets and drainage facilities. The Engineering Division is
responsible for reviewing and/or preparing construction plans, issuing permits, and inspecting
new construction of all street and drainage systems. The Engineering Division also prepares long
range planning for street and drainage improvements. The Geographical Information System
(GIS) staff within the Engineering Division prepares and maintains a storm drain system inventory
and updates all storm drain maps.
PRIOR YEAR RESULTS & ACCOMPLISHMENTS
✓ Completed construction of Hurstview Drive Bridge Repairs over Lorean Branch near
Barbara Ann Drive.
✓ Continued coordinating with TXDOT on Bedford Euless Road Bridge Replacement over
Lorean Branch and the necessary utility adjustments.
✓ Completed construction of Norwood North Storm Drain Arch Pipe Rehabilitation, Phases
1 & 2.
FUTURE INITIATIVES
➢ Complete Preliminary Erosion Control Study on Walker Branch from Redbud Drive
downstream to State Highway 10, Lorean Branch at Fire Station No. 1, and Sulphur Branch
in Rickel Park
➢ Complete design of West Pipeline Road Phase 4 (bridge and storm drain portion)
➢ Continue coordinating with TXDOT on Bedford Euless Road Bridge Replacement over
Lorean Branch and the necessary utility adjustments.
➢ Design and construct 2023 Miscellaneous Storm Drain Improvements / Steve Drive and
Mary Drive