Page 293 - HurstFY23AnnualBudget
P. 293

APPROVED BUDGET FISCAL YEAR 2022-2023






                                                       CITY OF HURST
                 STORM DRAINAGE FUND                 ADMINISTRATION                      0663 ENGINEERING


               MISSION STATEMENT

               To provide for effective administration of Public Works activities that ensures safe and efficient
               storm drain systems and to ensure that all City public drainage improvements are designed and
               constructed in accordance with City regulations and accepted engineering and construction
               principles and practices.

               DIVISION DESCRIPTION
               The  Engineering  Division  of  the  Public  Works  Department  is  responsible  for  the  overall
               engineering  and  construction  of  streets  and  drainage  facilities.    The  Engineering  Division  is
               responsible for reviewing and/or preparing construction plans, issuing permits, and inspecting
               new construction of all street and drainage systems. The Engineering Division also prepares long
               range planning for street and drainage improvements.  The Geographical Information System
               (GIS) staff within the Engineering Division prepares and maintains a storm drain system inventory
               and updates all storm drain maps.
               PRIOR YEAR RESULTS & ACCOMPLISHMENTS

                   ✓  Completed  construction  of  Hurstview  Drive  Bridge  Repairs  over  Lorean  Branch  near

                       Barbara Ann Drive.
                   ✓  Continued coordinating with TXDOT on Bedford Euless Road Bridge Replacement over
                       Lorean Branch and the necessary utility adjustments.
                   ✓  Completed construction of Norwood North Storm Drain Arch Pipe Rehabilitation, Phases
                       1 & 2.

               FUTURE INITIATIVES

                   ➢  Complete  Preliminary  Erosion  Control  Study  on  Walker  Branch  from  Redbud  Drive
                       downstream to State Highway 10, Lorean Branch at Fire Station No. 1, and Sulphur Branch
                       in Rickel Park
                   ➢  Complete design of West Pipeline Road Phase 4 (bridge and storm drain portion)

                   ➢  Continue  coordinating  with  TXDOT  on  Bedford  Euless  Road  Bridge  Replacement  over
                       Lorean Branch and the necessary utility adjustments.
                   ➢  Design and construct 2023 Miscellaneous Storm Drain Improvements / Steve Drive and
                       Mary Drive

               GOALS, OBJECTIVES & PERFORMANCE MEASURES






                                                             293