Page 170 - Saginaw FY22 Adopted Annual Budget
P. 170

CITY OF SAGINAW
                            GOALS, OBJECTIVES AND PERFORMANCE MEASURES
                                                        2021-2022

            WATER & WASTEWATER

                City             FY 2020-2021                 FY 2020-2021                  FY 2021-2022
              Strategy         Department Goal            Department Achievement           Department Goal


                                                     Accomplished maintaining reserves at
                        Maintain  reserves  at  25%  of  the                       Maintain  reserves  at  25%  of  the
                        Enterprise Fund operating budget.  25% of the Enterprise Fund operating  Enterprise Fund operating budget.
                                                     budget.




                                                     Accomplished  maintaining  Moody's
                        Maintain Moody's rating of Aa3 and  rating of Aa3 and Standard and Poor's  Maintain Moody's rating of Aa3 and
                        Standard and Poor's rating of AA/Stable.                   Standard and Poor's rating of AA/Stable.
                                                     rating of AA/Stable.
              Maintain a
              financially
             sound City   Construct the Northwest Booster Pump  Construction has started on both the Complete the Northwest Booster Pump
              providing                              Northwest Booster Pump Station and Station, Saginaw Boulevard 16" water
              superior   Station and the Saginaw Boulevard 16"  Saginaw Blvd 16" water line phase 2 and line phase 2 and Fort Worth meter
              services  water line phase 2.          is ongoing.                   station upgrade.


                          Complete the Resiliency Study and                          Complete the Resiliency Study and
                         Emergency Response Plan by June   The Resiliency Study and Emergency   Emergency Response Plan by June
                                                          Response Plan is in process.
                                    2021.                                                       2022.



                        Complete replacement of water meters   Replacement of water meters is still   Complete replacement of water meters
                         with those using cellular technology.   ongoing             with those using cellular technology.



                                                  LONG TERM OBJECTIVES

            Implement a leak detection/water loss program on our water system.

            Replace water lines as designated on the Capital Improvements Plan.

            Perform random water meter accuracy tests throughout the system.

            Replace wastewater lines as designated on the Capital Improvements Plan.

            Inspect, reseal and/or replace, as necessary, all wastewater manholes.

            Maintain current certifications through continuing education credits and seek new certifications.

            Promote the “Clean It Like You Mean It” program to rid the City of hazardous waste, tires, etc.












                                                             167
   165   166   167   168   169   170   171   172   173   174   175