Page 23 - Project Detail Sheet_AdoptedBook
P. 23
ADOPTED | BUDGET
Drainage Projects
Street Drainage Improvements will be performed in multiple locations in the City during
2021/2022 to help restore positive drainage at some of the 184 locations identified in the City.
This project will help to remove standing water problems, which contribute to the premature
deterioration of asphalt on City streets.
Utility Projects
Sewer Manhole Replacement and Rehabilitation efforts will continue in 2021/2022 to replace
and restore 150 of the 660 manholes currently in need of replacement. This project helps to
reduce overall sewer treatment costs to the city by reducing the inflow infiltration from rainwater
into the sewer system.
Major Equipment
In 2021/2022, the City will be replacing an ambulance and backhoe. Based on the age and
maintenance needs for the current equipment, staff anticipate that replacement of this vehicle
and equipment will have a positive impact on the overall maintenance costs for the operation.
23
NRH | TEXAS