        Public Works                             Concrete Lined Channel Rehabilitation Project           DR2102
                                                      Project Description
        This project involves ongoing rehabilitation of the City's seven (7) miles of concrete lined channels.  The scope of the project will
        include repairing areas of channel that have deteriorated, cracked, dropped, collapsed, heaved, or hold water due to heavy ground
        movement and/or age.  The needed repairs include patching of channel walls and channel bottoms, replacing wall sections, and
        replacing channel bottom sections to ensure proper drainage.  The intent is to utilize $250,000 in funding every other year to arrive at
        a total project amount of $1,000,000 over seven years.





                                                      Project Justification
        Concrete channels  are designed to transport storm water run off during rain events.  When these channels have areas of
        deteriorated concrete channel liner, flowing water has the ability to penetrate the concrete subgrade, which undermines the integrity
        of the channel and poses a threat to public and private property.  Some areas in the concrete channels hold extensive amounts of
        water because of deterioration that has occurred, which becomes a breeding ground for mosquito larvae and raises citizen concern.

        These types of repairs cannot be made within the current General Fund operating budget.  The repairs are specialized and must be
        done by private sources.  No engineering work is expected for this project.

        Note: Project funding source is the Drainage Utility Fund (120).








        Project Schedule            Beginning Date   Ending Date        History          Fiscal Year   Amount
        Professional Services                                        Adopted Budget        2020-21       $250,000
        Engineering/Design                                               Total                           $250,000
        Land/ROW Acquisition
        Construction                     10/2020         09/2021
        Other
        Total Schedule                   10/2020         09/2021
        Sources of Funds             Appr. To Date  2021‐22 Budget  2022‐23 Estimate  2023‐Completion  Total Funding
        General Obligation Bonds
        Certificates of Obligation
        Federal/State Grants
        Reserves                         250,000              0                0               0         $250,000
        Sales Tax
        Other
        Total Funding                   $250,000             $0               $0              $0          $250,000

        Project Costs                  To Date    2021‐22 Budget  2022‐23 Estimate   2023‐Completion    Total Cost
        Professional Services
        Engineering/Design
        Land/ROW Acquisition
        Construction                     250,000               0               0               0          $250,000
        Other
        Total Costs                      $250,000             $0              $0              $0          $250,000
        Operating Impact
        No operating impact is anticipated.


        Fiscal Year                2020‐21       2021‐22      2022‐23       2023‐24       2024‐25     Total Impact
        Amount                           $0            $0            $0            $0            $0           $0



                                                             129

                                                                                                     NRH  | TEXAS
   128   129   130   131   132   133   134   135   136   137   138