FY 2021‐22 KELLER FEE SCHEDULE



            Sec. 2 ‐ Planning and Engineering


            Supplemental Plan Review Fee                $50 per hour (minimum 2 hours residential and 3 hours commercial).  Only
                                                        assessed after original set of plans has been reviewed and approved for
                                                        construction and changes are made to the plans by the developer/owner/
                                                        builder/representative

            Resubmittal Fee                             $500 per resubmittal when plans are resubmitted and 30% or more previous
                                                        comments have not been addressed.

            Inspection Fee – Streets and Drainage       Four percent (4%) of construction value, plus $60/hour overtime (as
                                                        necessary)

            Water and Sewer Inspection                  Four percent (4%) of construction value, plus $60/hour overtime (as
                                                        necessary)


            Water Service Tap/Meter                     Short Tap and Meter Installation
            (Corporate City Limits)                     ⅝˝ ‐ $450
                                                        ¾˝ ‐ $475
                                                        1˝‐ $500
                                                        1½ ‐ $900
                                                        2˝*** ‐$ 1,025
                                                        2” Compound Meter ‐ $2,325

            Water Service Tap/Meter                     Long Tap and Meter Installation
            (Corporate City Limits)                     ⅝˝ ‐ $800
            (cont.)                                     ¾˝ ‐ $825
                                                        1˝ ‐ $850
                                                        1½” ‐$ 1,275
                                                        2˝*** ‐$ 1,425
                                                        2” Compound Meter ‐ $2,725

                                                        Install meter only
                                                        ⅝˝ ‐ $275
                                                        ¾˝ ‐ $300
                                                        1˝ ‐ $325
                                                        1½” ‐ $725
                                                        2˝*** ‐ $775
                                                        2” Compound Meter ‐ $2,075

                                                        * Water main and service on same side of street
                                                        **Water service (meter installation) on opposite side of street from water
                                                        main may include bore fees
                                                        *** Cost includes a 2” turbine or disc‐type meter


                                                        Outside City – Cost as determined on a case by case basis by Director of
                                                        Public Works based on actual costs and impact to the system

                                                        3˝ or more—Actual meter cost plus service charge fees.