Page 158 - FortWorthFY22AdoptedBudget
P. 158

General Fund



            SUMMARY OF SERVICES AND PERFORMANCE MEASURES

                                                          FY20           FY21            FY22
            Key Measures                                 Actual        Estimated        Target      Desired Level

            Street Maintenance

               Manage and maintain street infrastructure.


            # lane miles of pavement chip coating applied  21.3           9.2             18             18
            Repair potholes within 48 hours, 90 - 95% of the time   99%  100%            97%            97%


            Pavement Management
               Develop and direct street maintenance programs while also providing efficient customer service to internal and external customers.


            % of streets that are scored at 70% or better  78%            78%            70%            >70%


            Stormwater Operations
               Manage and maintain stormwater infrastructure

            # miles of open channel drainage system        7.46           5.75            7               7
            maintained/restored
            # drainage inlets cleaned and inspected       7,058          4,112           6,350          6,350

            # acres of vegetation in drainage easements mowed  1,523     1,027           1,480          1,480


            Transportation Engineering
               To plan, program and coordinate multimodal transportation system development by providing professional engineering services and
               safety program management.

            Retime 1/3 of the City's Signal Corridors annually to
            optimize traffic flow with changing in traffic patterns and   139  117       300             300
            volumes

            Conversion of residential street lights to LEDs within   913  752            275             275
            75% Majority Minority Areas (MMAs).


            Transportation Operations

               To actively operate, plan, and maintain the system of streetlights, signs and traffic signals in a manner that provides safety and achieves
               mobility across all modes of travel.

            Number of instances signals go on flash due to   390          308            300             300
            equipment failure.

            Traffic regulatory sign replacement within 4 hours of   97%   97%            95%            95%
            damage notification 95% of the time








                                                                                                           Page 158 of 581
   153   154   155   156   157   158   159   160   161   162   163