    Water

    Equipment Replacements

    Program Description                                            Strategic Plan Connection
    This project will replace heavy equipment utilized in the      3.2 Ensure regular replacement of water and
    Public Works Water/Wastewater Division.                        wastewater facilities


    Total Project Cost  $426,570
           Category                     Type                       Funding Source                  2022
    Water                 Equipment                       Capital Utility Fund                     $426,570.00







    L.D. Lockett Pump Station Emergency Generator
    Program Description                                            Strategic Plan Connection
    The project will design project plans and specifications and   3.2 Ensure regular repair and replacement of water and
    construction of a backup generator at the LD Lockett pump      wastewater facilities
    station to provide emergency energy in the event of power
    outage.

    Total Project Cost  $483,969
           Category                     Type                       Funding Source                  2022
    Water                 Equipment                       Grant                                    $362,977.00
    Water                 Equipment                       Capital Utility Fund                     $120,992.00





    Pleasant Run Road Water System Interconnection

    Program Description                                            Strategic Plan Connection
    The project includes the interconnection of the water system   3.2 Ensure regular repair and replacement of water and
    between the Cities of Colleyville and Southlake.               wastewater facilities

    Total Project Cost  $300,000

           Category                     Type                       Funding Source                  2022
    Water                 Water Renewals                  Capital Utility Fund                     $300,000.00













                                                                                                          287
   284   285   286   287   288   289   290   291   292   293   294