Page 320 - FY 2021-22 ADOPTED BUDGET
P. 320
Timberline Drainage Project - Several local streets that directly connect to Timberline Drive
significantly flatten out prior to their connection to the collector street. As a result, stormwater
designed to be captured within the Timberline Drive drainage system ponds on the local streets.
The project would extend storm drainpipes from the Timberline Drive system to the local streets.
New stormwater curb inlets would be installed on the local streets connecting to the newly
extended storm drainpipes.
219