Timberline  Drainage  Project  -  Several  local  streets that  directly  connect  to Timberline  Drive
               significantly flatten out prior to their connection to the collector street.  As a result, stormwater
               designed to be captured within the Timberline Drive drainage system ponds on the local streets.
               The project would extend storm drainpipes from the Timberline Drive system to the local streets.
               New stormwater curb inlets would be installed on the local streets connecting to the newly
               extended storm drainpipes.