                                                     Public Safety

                             Goal 2: Mitigate Flood Risks and Protect Stormwater Infrastructure
                                         Objective 3: Enhance Awareness of Stormwater Risk
                        Project                     Performance Measure(s)                 Department(s)
             Core   Stream Gauge            Implement a flood hazard notification   Public Works & Transportation
             PS    Infrastructure Upgrade and  system based on stream gauge data
             2.3.3  Communication
             Summary:
                                                                          Milestone    Estimated      Actual
             The City of Arlington currently has six stream gauges. These gauges       Completion   Completion
             collect important information such has rainfall accumulation,   Task 1    Nov. 2021
             rainfall increments, and water levels. The stream gauge uses the   Task 2   Jan. 2022
             ALERT (Automated Local Evaluation in Real Time) 1 system which   Task 3   May 2022
             needs an upgrade as hardware improves. This real time data will
             assist in response time for activating barricade infrastructure,
             emergency operations, and engineering assessments. During FY
             2021, the Floodplain Group will perform the following three tasks:
                    Task 1:  Upgrade two existing stream gauges to Automated
                    Local Evaluation in Real Time 2 (ALERT 2) system to
                    increase the accuracy and performance of flood detection
                    systems.
                    Task 2:  Identify low crossings based on watershed studies
                    and Emergency Operations to determine two new
                    locations to install stream gauges.
                    Task 3:  Identify grants and possible funding opportunities
                    to assist in installing at least six additional gauges within
                    the City limits.

             This data collected by the stream gauges benefits the citizens of
             Arlington by informing them about active flood risks to take
             appropriate action. The implementation of a flood hazard
             notification system will reduce the potential loss of life or injury due
             to flood hazards from overtopped roadways. The collected data
             also assists in identifying flood protection projects to be
             incorporated into the Stormwater Capital Improvement Plan.