Drainage Capital Projects
        Department                                             Project Title                         Project Number
        Public Works                             Street Drainage Improvements Project (2021)             DR2101
        Project Description
        This project consists of addressing a portion of the numerous non-grade standing water requests Public Works receives each year.
        This would be accomplished by removing and replacing curb and gutter systems to an adequate grade that provides positive
        drainage along City streets. Creating positive drainage along streets can sometimes require drive approaches and sidewalks to be
        replaced as well to accommodate the new grade. When this project was initially approved the list of streets to be repaired was 193
        locations at the cost of $640,000, the current list is comprised of 159 locations at the cost of $543,682. This project would be
        considered an annual project until such time as the list of requests is completed or until the list can be accomplished within the
        operating budget.


        Project Justification
        The Public Works Department receives numerous citizen request for non-grade standing water problems along City streets each
        year. These requests are repaired in the order in which they are received unless the severity of the grade causes a public safety
        issue. Within our operating budget there are only so many requests we can complete due to budget constraints. Thus leaving
        numerous repairs remaining on our list each year. Standing water along City streets contributes to premature deterioration of
        asphalt, provides an environment for breeding mosquitos which causes a public health issue and is unsightly and concerning to
        residents that live near it.
        Note: Project funding source is the Drainage Utility Fund (120).










        Project Schedule        Beginning Date  Ending Date  History       Fiscal Year   Amount
        Professional Services                             Proposed          2020-21       $100,000
        Engineering/Design                                Total                           $100,000
        Land/ROW Acquisition
        Construction               10/2020      09/2021
        Other
        Total Schedule             10/2020      09/2021
        Sources of Funds          To Date    2020-21 Budget 2021-22 Estimate  2022-Completion  Total Funding
        General Obligation Bonds
        Certificates of Obligation
        Federal/State Grants
        Reserves                          0        100,000            0             0      $100,000
        Sales Tax
        Other
        Total Funding                    $0        $100,000          $0            $0      $100,000
        Project Costs             To Date    2020-21 Budget 2021-22 Estimate  2022-Completion  Total Cost
        Professional Services
        Engineering/Design
        Land/ROW Acquisition
        Construction                      0        100,000            0             0      $100,000
        Other
        Total Costs                       $0       $100,000          $0            $0      $100,000
        Operating Impact
        No operating impact is anticipated.


        Fiscal Year                2020-21       2021-22      2022-23       2023-24       2024-25     Total Impact
        Amount                           $0            $0            $0            $0            $0            $0
        Total Operating Impact           $0            $0            $0            $0            $0            $0




                                                             106