Page 237 - Keller Budget FY21
P. 237

WASTEWATER UTILITIES DEPARTMENT

                       WASTEWATER COLLECTION DIVISION (200-750-80)




             DEPARTMENT DESCRIPTION:
             The Wastewater Collection Division is responsible for operating and maintaining the facilities necessary to serve the City's
             residential, commercial and industrial wastewater customers. This includes facilities for collecting and transporting wastewater
             from the point of origin to the main interceptor line (Trinity River Authority), while providing a safe and healthy environment.
             Duties of the division also include maintenance of lift stations, wastewater manholes, mains and services, and installation of
             new wastewater mains, taps and services.


             DEPARTMENT/DIVISION GOALS:
             1. Perform necessary maintenance and repairs to wastewater mains and services, manholes, lift stations, and related facilities
             throughout the collection system in order to minimize any disruption of service.
             2. Repair breaks and defects in wastewater mains and service lines.
             3. Install wastewater service lines (sewer taps) as required for new customers.
             4. Perform routine maintenance cleaning of wastewater lines to minimize service interruptions.
             5. Inspect, repair, and maintain lift stations in good working condition.
             6. Maintain, inspect, repair, and replace wastewater manholes.  Collect GPS coordinates.
             7. Locate City-owned wastewater lines for contractors and excavators.
             8. Conduct internal CCTV pipe inspections of wastewater mains and services to assess the physical condition and identify
             sections in need of repair or replacement.

             DEPARTMENT/DIVISION OBJECTIVES:
             1. Purchase equipment necessary for effective operations.
             2. Conclude flow meter installation with Colleyville.
             SERVICE LEVEL ANALYSIS:
                                                                                        FY 2020-21
                                                 FY 2018-19    FY 2019-20   FY 2019-20    Adopted
             SERVICES PROVIDED                     Actual       Budget       YE Proj.     Budget
             Total miles of WW mains maintained     209           212          211          212
             Total miles of WW mains cleaned       63.14          40.0        40.0         40.0
             Total miles of WW lines videoed        6.2           3.0          3.0          3.0
             Work orders completed                  839           750          750          750
             Sewer manholes maintained             3,500         3,800        3,600        3,800
             Sewer manholes inspected               679           200          250          300
             Lift stations maintained                6             6            6            6
             Sewer taps installed                    10            5            4            5
             Line locates performed                 456           350          450          450
             # of WW main line blockages             8             6            6            6
             # active WW customers on Sept 30th    13,520        13,650      13,650       13,750

             PERFORMANCE INDICATORS
             % blocked mains cleaned w/in 24 hrs   100%          100%         100%         100%
             % WW lines cleaned as scheduled       100%          100%         100%         100%

















                                                             235
   232   233   234   235   236   237   238   239   240   241   242