Page 344 - Hurst Budget FY21
P. 344

CITY OF HURST


           STORM DRAINAGE FUND                     PUBLIC WORKS                         0664 STREETS



               Council Priorities:


               ☐Public Safety                    ☐Innovation
               ☐Economic Vitality                ☐Redevelopment
               ☒Infrastructure                   ☐Leadership



               Goals:
                   •   Identify drainage issues for Engineering Division.
                   •   Maintain the drainage systems in a condition for efficient and safe passage of storm water.
                   •   Control vegetation in channels.
                   •   Maintain Surface Drainage Program which includes curb and gutter, driveways, sidewalks
                       and valley gutters.

               Objectives:
                   •   Street sweeping.
                   •   Select specific sections of curb & gutter, valley gutters, and street pavement to replace.
                   •   Control vegetation in channels by mowing and chemical application.
                   •   Inspections and repairs of channels and bridges.
                   •   Inlet inspections and decals.
                   •   Maintain the drainage system and clear obstructions before and after rain events.




                                           PERFORMANCE MEASURES


                 Input:                                  PY Actual         CY Estimate          Projected


                 Drainage employees                           4                  4                   4
                 Drainage expenditures                    $803,190           $911,007            $868,618

                 Workload/Output:

                 Vegetation applications per year             3                  3                   3

                 Inlets inspected/cleaned                   84%                 88%                89%

                 Storm drain decals replaced                258                 250                350
                 Silt removal from drainage system        150 tons            200 tons           200 tons

                 Effectiveness:
                 Streets cleaned/swept three times
                 a year                                    100%                100%                100%






                                                            332
   339   340   341   342   343   344   345   346   347   348   349