Page 340 - Hurst Budget FY21
P. 340
CITY OF HURST
STORM DRAINAGE FUND PUBLIC WORKS 0663 ENGINEERING
MISSION STATEMENT
To provide for effective administration of Public Works activities that ensures safe and
efficient storm drain systems and to ensure that all City public drainage improvements are
designed and constructed in accordance with City regulations and accepted engineering
and construction principles and practices.
DIVISION DESCRIPTION
The Engineering Division of the Public Works Department is responsible for the overall
engineering and construction of streets and drainage activities. The Engineering Division is
responsible for reviewing and/or preparing construction plans, issuing permits, and inspecting
new construction of all street and drainage systems. The Engineering Division also prepares long
range planning for street and drainage improvements. The Geographical Information System
(GIS) staff within the Engineering Division prepares and maintains a storm drain system inventory
and updates all storm drain maps.
PRIOR YEAR RESULTS & ACCOMPLISHMENTS
Completed construction of Cimarron Trail drainage improvements.
Completed design of Hurstview Drive bridge repairs over Lorean Branch.
Completed design and began construction of Valley View Branch channel repairs.
Completed construction of Valley View Drive drainage improvements (1148 Valley View
Drive).
FUTURE INITIATIVES
Complete construction of Hurstview Drive bridge repairs over Lorean Branch.
Complete construction of Valley View Branch channel repairs from East Pipeline Road to
Plaza Boulevard).
Design Norwood North storm drain arch pipe rehabilitation.
Design Bedford Court East bridge repairs over Valley View Branch.
Design of Pipeline Road Phase 4 (storm drain portion).
GOALS, OBJECTIVES & PERFORMANCE MEASURES
Council Priorities: Infrastructure
328