CITY OF HURST


           STORM DRAINAGE FUND                     PUBLIC WORKS                      0663 ENGINEERING



               MISSION STATEMENT

               To provide for effective administration of Public Works activities that ensures safe and
               efficient storm drain systems and to ensure that all City public drainage improvements are
               designed and constructed in accordance with City regulations and accepted engineering
               and construction principles and practices.



               DIVISION DESCRIPTION

               The  Engineering  Division  of  the  Public  Works  Department  is  responsible  for  the  overall
               engineering  and construction  of streets and  drainage  activities.    The  Engineering  Division  is
               responsible for reviewing and/or preparing construction plans, issuing permits, and inspecting
               new construction of all street and drainage systems. The Engineering Division also prepares long
               range planning for street and drainage improvements.  The Geographical Information System
               (GIS) staff within the Engineering Division prepares and maintains a storm drain system inventory
               and updates all storm drain maps.




               PRIOR YEAR RESULTS & ACCOMPLISHMENTS

                    Completed construction of Cimarron Trail drainage improvements.
                    Completed design of Hurstview Drive bridge repairs over Lorean Branch.
                    Completed design and began construction of Valley View Branch channel repairs.
                    Completed construction of Valley View Drive drainage improvements (1148 Valley View
                       Drive).




               FUTURE INITIATIVES

                    Complete construction of Hurstview Drive bridge repairs over Lorean Branch.
                    Complete construction of Valley View Branch channel repairs from East Pipeline Road to
                       Plaza Boulevard).
                    Design Norwood North storm drain arch pipe rehabilitation.
                    Design Bedford Court East bridge repairs over Valley View Branch.
                    Design of Pipeline Road Phase 4 (storm drain portion).




               GOALS, OBJECTIVES & PERFORMANCE MEASURES

               Council Priorities: Infrastructure