Page 253 - Hurst Budget FY21
P. 253

CITY OF HURST


           ENTERPRISE FUND                         PUBLIC WORKS                          0668 WATER



                      Minimize cost and increase water revenues with proper management of the water
                       system.

               Objectives:
                      Assist the Engineering Division by prioritizing projects in the capital improvement
                       program manual into short, mid-range and long-term projects.
                      Evaluate the city infrastructure annually and determine projects that need rehabilitation
                       or new construction.
                      Monitor water quality to ensure compliance with Safe Drinking Water Act rules and
                       regulations.
                      Operate and maintain all water system equipment and facilities to ensure the safety of
                       the potable water delivered to the customers.
                      Maintain or reduce surcharge costs to the Fort Worth – Water Department annually by
                       maintaining or lowering the max-day and max-hour three-year averages for each.
                      Improve water accountability and reduction of lost revenues through commercial meter
                       testing, repair and replacement and prompt main leak repairs.





                                           PERFORMANCE MEASURES


                 Input:                                  PY Actual         CY Estimate          Projected

                 Operating budget                       $10,499,844         $10,334,491        $10,416,035

                 Water treatment                         $4,615,638         $4,545,542          $4,811,674

                 Annual water well production (MG)           6.2                7.0                 7.0
                 Workload/Output:

                 Water quality samples taken               3,300               3,500               3,500

                 Bacteriological samples analyzed           565                 580                580

                 Miles of water mains maintained            207                 207                207
                 Backflow assemblies tested                 1392               1486                1634

                 Backflow testers registered                106                 116                127

                 2” and larger meters tested                117                  5                 100
                 Feet of water main
                 installed/replaced                        2,285               2,690               5,000
                 Water valves operated/inspected
                 annually                                   40%                 40%                50%






                                                            241
   248   249   250   251   252   253   254   255   256   257   258