CITY OF HURST


           ENTERPRISE FUND                        PUBLIC SERVICES                    0663 ENGINEERING



               MISSION STATEMENT

               To provide for effective administration of Public Works activities that ensures safe and
               efficient water and sewer systems.  To ensure that all water and sewer improvements, as
               well as all City projects, are designed and constructed in accordance with City regulations
               and accepted engineering and construction principles and practices.




               DIVISION DESCRIPTION

               The Engineering/Construction Division of the Public Works Department is responsible for the
               overall supervision and administration of engineering and construction activities.  The Engineering
               Division is responsible for reviewing and/or preparing construction plans, issuing permits, and
               inspecting new construction of all public water and sanitary sewer systems.  The Engineering
               Division also reviews and prepares long-range planning  for water and  sanitary sewer
               improvements.  The Geographical Information System (GIS) staff within the Engineering Division
               prepares and maintains the water and  sanitary sewer inventory system, and maintains and
               updates all water and sanitary sewer maps.




               PRIOR YEAR RESULTS & ACCOMPLISHMENTS

                                                       th
                    Completed construction of the 44  Year CDBG Grant Project/Sheri Lane from Reed to
                       Cavender (water and sewer portion).
                    Coordinated with Trinity River Authority on finalizing design of Walker-Calloway
                       Wastewater Outfall System Rehabilitation Project Phase 2.
                    Began design of 2020 Water Main Replacements.
                    Completed design on 2020 Sanitary Sewer Replacements.
                    Hired a consulting firm to conduct an update to the Water and Wastewater Impact Fee
                       Study.
                    Hired a consulting firm to in completing the EPA’s unfunded mandate for a Risk and
                       Resilience Assessment & Emergency Management Plan for our water system.
                    Review of numerous private developments with public water and sanitary sewer.





               FUTURE INITIATIVES

                                                                       th
                    Complete design and begin construction of the 46 Year CDBG Grant Project/Livingston
                       Drive from Pipeline Road to 665 feet south (water and sewer portion).
                    Coordinate with Trinity River Authority on Walker-Calloway Wastewater Outfall System
                       Rehabilitation Project Phase 2 construction.