CITY OF HURST


           GENERAL FUND                            PUBLIC WORKS                      0663 ENGINEERING



               MISSION STATEMENT


               To provide for effective administration of Public Works activities that ensures safe and
               efficient roadway systems and to ensure that all City public paving improvements are
               designed and constructed in accordance with City regulations and accepted engineering
               and construction principles and practices.




               DIVISION DESCRIPTION

               The Engineering Division of the  Public Works Department is responsible for the overall
               supervision and administration of streets, drainage, engineering, and construction activities.  The
               Engineering Division is responsible for reviewing and/or preparing construction plans, issuing
               permits, and inspecting new construction of all sidewalks and street systems.  The Geographical
               Information System (GIS) staff within the Engineering Division prepares and maintains a street
               inventory classification  system, prepares  long-range planning for street improvements, and
               maintains and updates all street maps.




               PRIOR YEAR RESULTS & ACCOMPLISHMENTS

                    Completed construction of the 44 Year CDBG Grant Project/Sheri Lane from Reed to
                                                       th
                       Cavender.
                                             th
                    Began design of the 46 Year CDBG Grant Project/Livingston Drive from Pipeline Road
                       to 665 feet south.
                    Completed ROW acquisition for Pipeline Road Phase 3.
                    Notified franchised utility companies of conflict/adjustments for Pipeline Road Phase 3.
                    Completed design for Pipeline Road Phase 3 and advertised to bid.
                    Completed design of 2020 Miscellaneous Street Reconstruction Program.
                    Applied for Safe Routes to School 80/20 grant funding through the North Central Texas
                       Council of Governments (NCTCOG) for sidewalk construction near three elementary
                       schools.
                    Review of numerous private development projects.




               FUTURE INITIATIVES

                                                                       th
                    Complete design and begin construction of the 46 Year CDBG Grant Project/Livingston
                       Drive from Pipeline Road to 665 feet south.
                    Begin construction of 2020 Miscellaneous Street Reconstruction Program.
                    Complete 2021 Annual Street Rehabilitation Program with Tarrant County and
                       contractors.