              Drainage

              Drainage  improvements  are developed  to optimize the  performance and  maintainability  of the  overall
              existing system. Projects  are  identified  by utilizing  the 2019  Storm  Drainage Master Plan,  staff
              recommendations, community input, and review by the Drainage Task Force. All projects requiring funding
              are reviewed and acted on by the City Council.  Investments are  made in: rehabilitating degraded  open
              drainage channels to perform as designed and to facilitate ongoing maintenance; staff utilizes technology to
              inspect various aspects of the underground drainage system to ensure it is performing as designed; and by
              utilization of the work order system to track and identify recurring drainage problems so that an in-depth
              investigation can identify underlying causes and develop solutions.

              Program Summary: Drainage


               Drainage                            2021      2022      2023      2024     2025       Total

               Drainage Infrastructure

               Drainage Improvements FY2021       $500,000    —         —         —         —       $500,000

               Drainage Improvements FY2022         —      $500,000     —         —         —       $500,000
               Drainage Improvements FY2023         —         —      $500,000     —         —       $500,000

               Drainage Improvements FY2024         —         —         —      $500,000     —       $500,000

               Drainage Improvements FY2025         —         —         —         —      $500,000   $500,000
               Drainage Infrastructure Total      $500,000  $500,000  $500,000  $500,000  $500,000  $2,500,000

               Rehabilitation

               Flood Gates Upgrade                $425,000    —         —         —         —       $425,000
               Drainage Improvements at Nature      —      $400,000     —         —         —       $400,000
               Center
               Rehabilitation Total               $425,000  $400,000       $0        $0       $0    $825,000
               Drainage Total                     $925,000  $900,000  $500,000  $500,000  $500,000  $3,325,000