Page 182 - Saginaw FY20 Annual Budget
P. 182
£ ¤
287
Ú
14 Bailey Boswell Road Ú Ú
Ú
10 2 156
Ú Ú Ú Ú Ú 3 FM
Ú
Complete
1 Ú
Complete Ú
Ú 17
15
7 Complete
Ú
Ú Saginaw
Ú
Road 11
Blvd
Decatur Ú Ú
Old 8 8 18 Ú
4
Ú Ú E McLeroy Blvd
Ú
6 Ú Ú
Ú ÚÚ Ú
W McLeroy Blvd
Ú
5
156
FM
9
13 12
Ú Ú Ú Ú Ú
Longhorn Road E Industrial Ave
£ ¤
287
Matchline
Matchline
2016-2021 Street CIP
1) Bailey Boswell Ph. 2 & 3 Reconstruction
2) Bailey Boswell Overpass
3) Basswood Blvd.
4) E. McLeroy Blvd. Ph. 2 Reconstruction
5) W. McLeroy Blvd. Ph. 3 Reconstruction
6) W. McLeroy Blvd. Ph. 4 Reconstruction
7) Knowles Dr. Ph. 1 Reconstruction to 2 Lanes and Drainage Improvements
8) Knowles Dr.Ph. 2 Reconstruction to 3 Lanes and Roundabout at McLeroy
9) Knowles Dr. Ph. 3 Reconstruction to 3 Lanes and Drainage Improvements
10) Signal at Knowles & Bailey Boswell
11) W.J. Boaz
12) Industrial Bvd. Reconstruction Phase 1
13) Industrial Bvd. Reconstruction Phase 2
14) Old Decatur Road North
15) Bailey Boswell to McLeroy North-South Collector
16) Railroad Quiet Zone Implementation (Location TBD)
17) Heather Ridge Pkwy. Extension
18) E. McLeroy Blvd. (Western Center Extension)
Map Disclaimer
This map product is for informational
City of Saginaw, Texas purposes and may not have been
2019 CIP Update prepared for or be suitable for legal,
engineering, or surveying purposes.
STREET CIP It does not represent an on-the-ground
S
survey and represents only the
approximate relative location of property
July 2019
178 boundaries.