Page 313 - NRH FY20 Approved Capital Budget
P. 313

Major Capital Equipment Capital Projects
                                          Pothole Patcher Replacement (Unit 6609)
                                                           FS1904


           352-(&7 '(6&5,37,21   -867,),&$7,21
            This is for the purchase of a new pothole patcher to replace unit 6609, a 2002 year-model Freightliner. Estimated cost of the
            pothole patcher is $210,000. When replaced, the pothole patcher will be 17 years old and have an estimated odometer reading
            of 90,000 miles.  The CIP Major Capital equipment replacement program was implemented using the recommendations
            obtained in an independent study conducted for the City by Peat Marwick in August of 1986 and August of 1993 which
            recommended a minimum 10-year replacement for capital equipment. At the 10-year interval, the equipment is evaluated for
            replacement based on frequency of use, the number of like equipment in the fleet, equipment condition, and the availability of
            parts and service. The pothole patcher is a specialized one-of-a-kind unit setup used to maintain City streets. The City currently
            has two of these units in service. The replacement pothole patcher would be equipped with an energy-efficient clean-burning
            diesel engine which meets the replacement guidelines of the Clean Fleet Vehicle Program.



           352-(&7 67$786                         25,*,1$/                                25,*,1$/
                                                 67$57 '$7(    5(9,6,21                   (1' '$7(     5(9,6,21
           Professional Services
           Engineering                            10/2018                                 11/2018
           Land/ROW Acquisition
           Construction                           12/2018                                 04/2019
           Other

           5(9,6,21 (;3/$1$7,21
            Savings experienced from final purchase price of $8,063.66.  $412 in savings will be shifted to FS1903 Dump Truck to cover a
            slight overage.



           ),1$1&,$/ '$7$
                                                  $'237('                    5(9,6('                    727$/
                                                %8'*(7 7+58    352-(&7     %8'*(7 7+58   5(0$,1,1*     352-(&7
                                                               5(9,6,21                   %$/$1&(        &267
           )81',1* 6285&(6
            Certificates of Obligation              $210,000        ($412)     $209,588                  $209,588
                                                                                     0                         $0
                                                                                     0                         $0
                                                                                     0                         $0
                                                                                     0                         $0
           7RWDO                                    $210,000        ($412)     $209,588          $0      $209,588
           352-(&7 (;3(1',785(6
                                                                                    $0                         $0
             Professional Services
             Engineering/Design                                                      0                         $0
             Land/ROW Acquistion                                                     0                         $0
             Construction                            210,000         (412)      209,588                  $209,588
             Other                                                                   0                         $0
           7RWDO                                    $210,000        ($412)     $209,588          $0      $210,000

           ,03$&7 21 23(5$7,1* %8'*(7




           $118$/ 23(5$7,1* ,03$&7                                                                      727$/
           Projected                                                                                           $0



                                                             293
   308   309   310   311   312   313   314   315   316   317   318