                                          Sanitary Sewer Trunk Line Rehabilitation
                                                           UT1704


           352-(&7 '(6&5,37,21   -867,),&$7,21
            This project will reconstruct approximately 550 feet of 18 inch sanitary sewer line. The line is located near the drainage ditch
            and channel for Mackey Creek.  The project will start at the existing line located near Jackie Lee and end near Harmonson
            Road. This sewer line was constructed in the 1970's and has shown signs of failing.  Last year a portion of the line collapsed
            and caused sanitary sewer to overflow into the channel until it could be repaired.











           352-(&7 67$786                         25,*,1$/                                25,*,1$/
                                                 67$57 '$7(    5(9,6,21                   (1' '$7(     5(9,6,21
           Professional Services
           Engineering
           Land/ROW Acquisition
           Construction                           10/2016                                 09/2017
           Other

           5(9,6,21 (;3/$1$7,21
            Funds are needed for an emergency repair to a 24" sewer line.




           ),1$1&,$/ '$7$
                                                  $'237('                    5(9,6('                    727$/
                                                %8'*(7 7+58    352-(&7     %8'*(7 7+58   5(0$,1,1*     352-(&7
                                                               5(9,6,21                   %$/$1&(        &267
           )81',1* 6285&(6
            Reserves                                $125,000     ($31,604)      $93,396                   $93,396
                                                                                     0                         $0
                                                                                     0                         $0
                                                                                     0                         $0
                                                                                     0                         $0
           7RWDO                                    $125,000     ($31,604)      $93,396          $0       $93,396
           352-(&7 (;3(1',785(6
                                                                                    $0                         $0
             Professional Services
             Engineering/Design                                                      0                         $0
             Land/ROW Acquistion                                                     0                         $0
             Construction                            125,000      (31,604)       93,396                   $93,396
             Other                                                                   0                         $0
           7RWDO                                    $125,000     ($31,604)      $93,396          $0       $93,396

           ,03$&7 21 23(5$7,1* %8'*(7
            No operating impact is anticipated.


           $118$/ 23(5$7,1* ,03$&7                                                                      727$/
           Projected                                                                                           $0



                                                             284
   299   300   301   302   303   304   305   306   307   308   309