Parks & Recreation Capital Projects
Barfield/Cotton Belt Trail Connector
PK1401
352-(&7 '(6&5,37,21 -867,),&$7,21
This project provides for the design and construction of a pedestrian connection between the Cotton Belt Trail and the new
John Barfield Trail immediately west of Precinct Line Road and south of the Tarrant County Maintenance Facility. The Cotton
Belt Trail intersects Precinct Line Road south of the Cotton Belt Railroad and the new John Barfield Trail will dead end at
Precinct Line Road north of the Cotton Belt Railroad. The connector that will link the two trails will be designed to be between 5’
and 10’ wide depending on existing site conditions and their opportunities or constraints. The trail connection is expected to be
approximately 185’ long and will cross the Cotton Belt Railroad within the TxDOT right of way using concrete crossing panels
that would be approved by DART and the Fort Worth and Western Railroad. This crossing is contingent upon final approval by
DART, TxDOT, and Fort Worth and Western and must be coordinated with the new Tex-Rail project.
352-(&7 67$786 25,*,1$/ 25,*,1$/
67$57 '$7( 5(9,6,21 (1' '$7( 5(9,6,21
Professional Services
Engineering
Land/ROW Acquisition
Construction
Other
5(9,6,21 (;3/$1$7,21
This project is completed and was closed during the fiscal year. The remaining balance of the project was transferred to
PK1904 to help offset emergency repairs to Cross Timbers Park.
),1$1&,$/ '$7$
$'237(' 5(9,6(' 727$/
%8'*(7 7+58 352-(&7 %8'*(7 7+58 5(0$,1,1* 352-(&7
5(9,6,21 %$/$1&( &267
)81',1* 6285&(6
Sales Tax $65,000 ($932) $64,068 $64,068
0 $0
0 $0
0 $0
0 $0
7RWDO $65,000 ($932) $64,068 $0 $64,068
352-(&7 (;3(1',785(6
$5,000 $5,000 $5,000
Professional Services
Engineering/Design 60,000 (932) 59,068 $59,068
Land/ROW Acquistion 0 $0
Construction 0 $0
Other 0 $0
7RWDO $65,000 ($932) $64,068 $0 $64,068
,03$&7 21 23(5$7,1* %8'*(7
No operating impact anticipated.
$118$/ 23(5$7,1* ,03$&7 727$/
Projected $0