CAPITAL IMPROVEMENT PROGRAM OVERVIEW


          In 2019/2020, the City will be replacing a 24-inch wastewater main running from the Fort Worth
            meter station to just south of Holland Dr.  During this fiscal year, three major sewer line collapses
            were experienced in this line.  Staff were able to determine that the line has significant detrition
            due  to  hydrogen  sulfide  gas.    This  replacement  will  install  a  PVC pipe in place of the current
            reinforced  concrete  pipe.  Staff  anticipate  a  100-year  life  on  the  PVC  pipe  and  an  anticipate
            savings from future expenses that would likely have been incurred from future failures in the line.


        Major Capital Equipment

          Several  significant  pieces  of  equipment  are  included  in  the  Adopted  budget  this  year  for
            replacement, including an Ambulance, (2) Wheel Loaders, (2) Backhoes, a Roller, and a Utility
            Tractor.  The majority of these units have exceeded their useful life and have begun to increase in
            maintenance  cost  and  repair  time  to  upkeep.    Replacement  of  these  units  will  help  improve
            operational efficiency and reduce annual maintenance costs associated with these vehicles.