Page 163 - NRH FY20 Approved Capital Budget
P. 163

Utility Capital Projects
        Department                                             Project Title                         Project Number
        Public Works                               Small Water Main Replacements (2020)                   UT2001
        Project Description
        This is an annual program that is completed by the Public Works Construction Division. The project replaces old 2" and 4" water
        mains with 6" or larger diameter water pipes. This project provides adequate fire hydrant coverage to areas currently without proper
        coverage. This project will provide for small water main replacement on the following streets: Sweetbriar Court (Noneman Drive to
        Culd), Puerto Vallarta Drive (Sierra Drive to Buenos Aires Drive) and Guadalajara Drive (Trinidad Drive to Buenos Aires Drive).






        Project Justification
        This is an annual program that is completed by the Public Works Construction Division. The project replaces old 2" and 4" water
        mains with new 6" or larger water pipes and provides adequate fire hydrant coverage to areas currently without proper coverage. In
        addition, this project helps to replace water lines that have deteriorated to a point where numerous water line breaks are occurring
        and keep water quality to high standard.

        Funding Source: Certificates of Obligation.












        Project Schedule        Beginning Date  Ending Date  History       Fiscal Year   Amount
        Professional Services                             Proposed          2019-20       $440,000
        Engineering/Design                                Total                           $440,000
        Land/ROW Acquisition
        Construction               10/2019      09/2020
        Other
        Total Schedule             10/2019      09/2020
        Sources of Funds          To Date    2019-20 Budget 2020-21 Estimate  2021-Completion  Total Funding
        General Obligation Bonds
        Certificates of Obligation        0        440,000            0             0      $440,000
        Federal/State Grants
        Reserves
        Sales Tax
        Other
        Total Funding                     $0       $440,000          $0            $0      $440,000
        Project Costs             To Date    2019-20 Budget 2020-21 Estimate  2021-Completion  Total Cost
        Professional Services
        Engineering/Design
        Land/ROW Acquisition
        Construction                      0        440,000            0             0      $440,000
        Other
        Total Costs                       $0       $440,000          $0            $0      $440,000
        Operating Impact
        No operating impact is anticipated.


        Fiscal Year                2019-20       2020-21      2021-22       2022-23       2023-24     Total Impact
        Amount                            $0           $0            $0            $0            $0            $0
        Total Operating Impact            $0           $0            $0            $0            $0            $0




                                                             153