Page 235 - Keller FY20 Approved Budget
P. 235

WASTEWATER UTILITIES DEPARTMENT
                        WASTEWATER COLLECTION DIVISION (200-750-80)




             DEPARTMENT DESCRIPTION:
             The Wastewater Collection Division is responsible for operating and maintaining the facilities necessary to serve the City's
             residential, commercial and industrial wastewater customers. This includes facilities for collecting and transporting wastewater
             from the point of origin to the main interceptor line (Trinity River Authority), while providing a safe and healthy environment.
             Duties of the division also include maintenance of lift stations, wastewater manholes, mains and services, and installation of new
             wastewater mains, taps and services.


             DEPARTMENT/DIVISION GOALS:
             1. Perform necessary maintenance and repairs to wastewater mains and services, manholes, lift stations, and related facilities
             throughout the collection system in order to minimize any disruption of service.
             2. Repair breaks and defects in wastewater mains and service lines.
             3. Install wastewater service lines (sewer taps) as required for new customers.
             4. Perform routine maintenance cleaning of wastewater lines to minimize service interruptions.
             5. Inspect, repair, and maintain lift stations in good working condition.
             6. Maintain, inspect, repair, and replace wastewater manholes.  Collect GPS coordinates.
             7. Locate City-owned wastewater lines for contractors and excavators.
             8. Conduct internal CCTV pipe inspections of wastewater mains and services to assess the physical condition and identify
             sections in need of repair or replacement.

             DEPARTMENT/DIVISION OBJECTIVES:
             1. Purchase equipment which shall allow for the efficient operations of the department.


             SERVICE LEVEL ANALYSIS:
                                                                                        FY 2019-20
                                                 FY 2017-18    FY 2018-19   FY 2018-19   Adopted
             SERVICES PROVIDED                     Actual       Budget      YE Proj.      Budget
             Total miles of WW mains maintained     208           212         210          212
             Total miles of WW mains cleaned       44.25          35.0        40.0         40.0
             Total miles of WW lines videoed        6.3           3.5          3.0          3.0
             Work orders completed                  841           800         750          750
             Sewer manholes maintained             3,400         3,500        3,650        3,800
             Sewer manholes inspected               185           150         200          200
             Lift stations maintained                6             6           6            6
             Sewer taps installed                    5             3           6            5
             Line locates performed                 424           250         350          350
             # of WW main line blockages             6             8           6            6
             # active WW customers on Sept 30th    13,459        13,500      13,550       13,650

             PERFORMANCE INDICATORS
             % blocked mains cleaned w/in 24 hrs   100%          100%         100%         100%
             % WW lines cleaned as scheduled       100%          100%         100%         100%