Page 230 - Keller FY20 Approved Budget
P. 230

WATER UTILITIES DEPARTMENT
                            WATER DISTRIBUTION DIVISION (200-730-75)




             DEPARTMENT DESCRIPTION:
             The Water Distribution Division is responsible for operating and maintaining the water distribution facilities necessary to serve
             the City's residential, commercial and industrial water customers. Included in the division's responsibilities are installing and
             maintaining water meters, repairing and replacing water mains and services, installing new water mains and water taps, and
             installing and maintaining water valves and fire hydrants.


             DEPARTMENT/DIVISION GOALS:
             Perform necessary maintenance and repairs to water mains and services, water valves, fire hydrants, and related facilities
             throughout the distribution system in order to minimize any disruption of service.

             DEPARTMENT/DIVISION OBJECTIVES:
             1.  Locate and repair water main and service line leaks.
             2.  Maintain, inspect, repair, and replace water valves. Collect GPS coordinates.
             3.  Inspect, repair, and maintain fire hydrants in good working condition.
             4.  Install water service lines (water taps) as required for new customers.
             5.  Locate City-owned water lines for contractors and excavators.


             SERVICE LEVEL ANALYSIS:

                                                                                        FY 2019-20
                                                 FY 2017-18    FY 2018-19   FY 2018-19   Adopted
             SERVICES PROVIDED                     Actual       Budget      YE Proj.      Budget
             Total miles of water mains maintained  275           278         278          280
             Total number of water valves maintained  6,000      6,100        6,125        6,200
             Total number of fire hydrants maintained  2,350     2,400        2,375        2,400
             Work orders completed                 1,496         1,400        1,400        1,400
             Water leaks repaired (water mains)      26           20           20           20
             Water leaks repaired (water services)  113           120         100          100
             Water valves repaired/replaced          4             4           3            4
             Fire hydrants repaired/replaced         28            5           20           10
             Water taps installed                    18           12           6            8
             Line locates performed                 424           250         350          350
             # active water customers on Sept 30th  15,766       15,850      15,900       16,000


             PERFORMANCE INDICATORS
             % of water service interruptions <2.5 hrs  100.0    100.0        100.0        100.0
             % of valves exercised as scheduled     2%            2%           2%           2%



















                                                             228
   225   226   227   228   229   230   231   232   233   234   235