DRAINAGE BOND FUND
FUNDED PROJECTS
Project Description Project Justification Status 09/30/19 Operating Impact 9/30/19
This project consists of repairs to joints, This project is necessary to improve traffic flow along Pipeline This project is currently in the TBD
substructure point repairs, spalled surface Road. This project will include the results of the redevelopment planning phase.
concrete, and the concrete railings. efforts and zoning overlay for the area east of Precinct Line
Road. Tarrant County has pledged to participate in 50% of the
construction cost.
The plans are to remove and replace what Recent heavy rains have contributed to the Valley View This project is currently in the TBD
channel liner is damaged as well as fortify the Branch concrete channel liner slopes cracking and heaving planning phase.
toe of slope on a portion of the channel. A upstream of East Pipeline Road to Plaza Boulevard. This
portion of the flume which comes in from the stretch of concrete channel is over 40 years old. The failures
east will be widen and reconnected. are severe enough to warrant quick evaluation of the failures
and design of repairs. The longer the failures are left without
repair there is a possibility for future damage to the adjacent
channel liner. Staff has taken action to temporarily mitigate
the situation while waiting for the repairs to be bid and
awarded.