Page 279 - Hurst FY20 Approved Budget
P. 279

CITY OF HURST


           ENTERPRISE FUND                          PUBLIC WORKS                      0663 ENGINEERING
                MISSION STATEMENT

                To provide for effective administration of Public Works activities that ensures safe and efficient
                water and sewer systems.  To ensure that all water and sewer improvements, as well as all City
                projects,  are  designed  and  constructed  in  accordance  with  City  regulations  and  accepted
                engineering and construction principles and practices.



                DIVISION DESCRIPTION

                The  Engineering/Construction  Division  of  the  Public Works  Department  is  responsible for  the
                overall supervision and administration of engineering and construction activities.  The Engineering
                Division is responsible for reviewing and/or preparing construction plans, issuing permits, and
                inspecting new construction of all public water and sanitary sewer systems.  The Engineering
                Division  also  reviews  and  prepares  long-range  planning  for  water  and  sanitary  sewer
                improvements.  The GIS staff within the Engineering Division prepares and maintains the water
                and sanitary sewer inventory system, and maintains and updates all water and sanitary sewer
                maps.



                PRIOR YEAR RESULTS & ACCOMPLISHMENTS

                                                                          th
                      Completed design and began construction of the 44   Year CDBG Grant Project / Sheri
                       Lane from Reed to Cavender (water and sewer portion).
                      Coordinated with Trinity River Authority on completing construction of Walker-Calloway
                       Wastewater Outfall System Rehabilitation Project, Phase 1.
                      Coordinated with Trinity River Authority on finalizing design of Walker-Calloway
                       Wastewater Outfall System Rehabilitation Project, Phase 2.
                      Completed construction of Valley View Branch Sanitary Sewer Interceptor Replacement
                       / SH10 to West Redbud Dr.
                      Completed construction of North Precinct Line Road Elevated Storage Tank Monitoring
                       and Treatment Unit, as well as Repairs to the 36 inch Riser.
                      Design and begin construction of 2019 Sanitary Sewer Replacements
                      Review of numerous private developments with public water and sanitary sewer.



                FUTURE INITIATIVES

                      Complete construction of 44  Year CDBG Grant Project / Sheri Lane from Reed to
                                                   th
                       Cavender (water and sewer portion).
                      Coordinate with Trinity River Authority on Walker-Calloway Wastewater Outfall System
                       Rehabilitation Project, Phase 1