Page 73 - Haltom City FY20 Approved Budget
P. 73

City of Haltom City Annual Budget, FY 2020
                                                                                        General Fund




           STREET AND DRAINAGE


             Mission Statement

           To perform maintenance of streets, drainage and traffic control systems in a manner that will
           provide for the safe and efficient movement of traffic and to ensure flow of storm water through
           the enclosed drainage collection system.

           The  Street  Maintenance  Department  general  duties  and  responsibilities  include  maintain  and
           repair streets, sweep streets and curbs, maintain and install traffic control devices (signs, signals
           and pavement markings), maintain and mow city owned properties.


             Accomplishments of FY2019


                 Milled and replaced Oregon Court Road with 181 tons of Type D mix (Surface Mix)
                 Milled and replaced Whitley Road surface with 403 tons of Type D
                 Resurfaced and replaced Marlene Drive with 45 tons of recycled concrete and 418 tons
                  of Type D mix
                 Repaired and resurfaced Denton Highway Service Road @ Ammons with underground
                  French drain system, 20 tons of recycled subgrade material and 82 tons of Type D mix
                 Replaced Cemetery Road subgrade with 50 tons of recycled concrete, and 178 tons of
                  Type D mix
                 Placed two H.A.W.K. Systems: one at Haltom Recreation Center, and one at the Buffalo
                  Park Crossing (North of High school)
                 Replaced 68 regulatory Signs
                 Repaired and replaced 56 traffic signals
                 Swept 510 miles of streets


             Objectives of FY2020


                 Install Battery Back-up Systems on Traffic Signal Lights
                 Decrease the amount of time for water/sewer street cut repairs
                 Replace subgrade and asphalt in the 4300 Block of Walthall
                 Replace subgrade and asphalt on Revere Road from Vicki Street to Ira Street
                 Mill and overlay at least 5,000 square yards of Haltom City streets.














                                                           Page 69
   68   69   70   71   72   73   74   75   76   77   78