CITY OF SAGINAW
                            GOALS, OBJECTIVES AND PERFORMANCE MEASURES
                                                        2018-2019

            WATER & WASTEWATER

                City             FY 2017-2018                 FY 2017-2018                  FY 2018-2019
              Strategy         Department Goal           Department Achievement            Department Goal



                        Add  $100,000  to  General  Fund Reserves were maintained at 90 days of  Maintain reserves at 25% of the Enterprise
                        Emergency Reserves and $100,000 to operating expenditures or 25% of the
              Maintain                                                             Fund operating budget.
              adequate   Enterprise Fund Emergency Reserves  Enterprise Fund operating budget.
            reserve funds to
            operate the city
             in case of a
              financial
             emergency  Maintain Moody's rating of Aa3 and  The rating remains the same.  Maintain Moody's rating of Aa3 and
                        Standard and Poor's rating of AA/Stable.                   Standard and Poor's rating of AA/Stable.




                                                     Completed  construction  of  the  S Completed  design  of  the  Saginaw
                        Construct S Hampshire 16" water line
                                                     Hampshire 16" water line.     Boulevard 16" water line phase 2.

             Maintain and
             upgrade the   Repair a small leak and resurface the   Repaired leak and resurfaced the Park   Complete construction of the Fairmont 12"
               City's     exterior of the Park Center overhead   Center overhead storage tank.  sewer rehabilitation phase 1.
            infrastructure to     storage tank.
             assure quality
              services

                                                                                   Complete miscellaneous projects identified
                         Construct Saginaw Blvd 12" water line   Construction continues on the Saginaw   during phase 1 of the inflow/infiltration
                                   phase 2              Blvd 12" water line phase 2 project.
                                                                                                study.

                                                  LONG TERM OBJECTIVES

            Implement a leak detection/water loss program on our water system.

            Replace water lines as designated on the Capital Improvements Plan.

            Perform random water meter accuracy tests throughout the system.

            Replace wastewater lines as designated on the Capital Improvements Plan.

            Inspect, reseal and/or replace, as necessary, all wastewater manholes.

            Maintain current certifications through continuing education credits and seek new certifications.

            Promote the “Clean It Like You Mean It” program to rid the City of hazardous waste, tires, etc.