Page 498 - Hurst FY19 Approved Budget
P. 498
PUBLIC WORKS
530 STORM WATER MANAGEMENT FUND
0663 ENGINEERING
MISSION STATEMENT
To provide for effective administration of Public Works activities that
ensures safe and efficient storm drain systems and to ensure that all
City public drainage improvements are designed and constructed
in accordance with City regulations and accepted engineering and
construction principles and practices.
DIVISION DESCRIPTION
The Engineering Division of the Public Works Department is responsible for the overall
engineering and construction of streets and drainage activities. The Engineering Division
is responsible for reviewing and/or preparing construction plans, issuing permits, and
inspecting new construction of all street and drainage systems. The Engineering Division
also prepares long range planning for street and drainage improvements. The GIS staff
within the Engineering Division prepares and maintains a storm drain system inventory
and updates all storm sewer maps.
PRIOR YEAR RESULTS & ACCOMPLISHMENTS
• Completed design of Cimarron Trail Drainage Improvements.
• Begun Design of Hurstview Drive Bridge Repairs over Lorean Branch
FUTURE INITIATIVES
• Begin Construction of Cimarron Trail Drainage Improvements
• Complete Design of Hurstview Drive Bridge Repairs over Lorean Branch
• Begin Construction of Hurstview Drive Bridge Repairs over Lorean Branch
• Design Norwood North Storm Drain Arch Pipe Rehabilitation
• Design Bedford Court East Bridge over Valley View Branch Repairs
• Design of Pipeline Road Phase 4 (storm drain portion)
481