Page 381 - Hurst FY19 Approved Budget
P. 381

PUBLIC WORKS

                                                   510 ENTERPRISE FUND
                                                     0669 WASTE WATER






                       MISSION STATEMENT


                       To minimize wastewater collection service interruptions, ensure
                       wastewater collection system infrastructure integrity and monitor

                       wastewater quality prior to entering the Fort Worth and Trinity River
                       Authority wastewater collection systems.


                       DIVISION DESCRIPTION


                       The  Wastewater/Environmental Division is responsible for the maintenance and
                       operation of the City’s wastewater collection system, which consists of approximately
                       154.25 miles of sanitary sewer lines, 2,862 manholes, and 284 cleanouts. The Wastewater/
                       Environmental Division ensures the City’s compliance with Federal wastewater discharge
                       limitations, implementation of the Sanitary Sewer Overflow Initiative, monitors high-
                       strength  wastewater customers,  manages  Grease  Hauler  Registrations,  the  W.I.S.E.
                       Guys Irrigation Program, the Vector Control program, Backflow and Cross-Connection
                       Programs and assists with the implementation of the City’s Storm Water Management
                       Program.


                       PRIOR YEAR RESULTS & ACCOMPLISHMENTS


                         •   Managed the Sanitary Sewer Overflow Initiative (SSOI) program by completing
                          60 miles of sewer main cleaning, root treated 2.7 miles of mains, chemically
                          treated 0 miles of mains for grease control and performed 20 main repairs.
                         •   Managed the Fats, Oils and Grease (FOG) program.
                         •   Managed the cities pretreatment program by registering and monitoring 17
                          grease haulers who maintain 202 commercial grease traps at various facilities
                          in Hurst.
                         •   Managed the surcharge program to reduce the Fort Worth wastewater
                          treatment charges by annual sampling 185 commercial and industrial sites.
                         •   Performed Internal Video Inspection of 13.8 miles of problematic sanitary
                          sewer mains.
                         •   Submitted the 2018 Sanitary Sewer Overflow Initiative Report to the Texas
                          Commission on Environmental Quality (TCEQ).
                         •   Submitted Hurst 2019 Wastewater Flow Projections to the Trinity River
                          Authority for their Central Regional Wastewater Treatment Plant operations.
                         •   Submitted the 2018 TCEQ Industrial User Report.






                                                             364
   376   377   378   379   380   381   382   383   384   385   386