Page 258 - Hurst FY19 Approved Budget
P. 258

PUBLIC WORKS

                                                    110 GENERAL FUND
                                                 0664 STREETS / DRAINAGE






                         •   Replace faded or damaged signs as needed.
                         •   Complete the replacement of the regulatory signs on the signal mast arms for
                          improved visibility.
                         •   Coordinate red light camera installations with Police Department, Engineering
                          Division and Redflex contractor.
                         •   Submit sidewalk recommendations to Engineering Division for the Safe Routes
                          to Schools Program.
                         •   Install battery backup systems for signal system at two intersections.
                         •   Install Vantage Radius Radar system at Precinct Line Rd @ Mid-Cities Blvd
                          intersection.


                       GOALS, OBJECTIVES & PERFORMANCE MEASURES


                       Council Priorities:
                        Public Safety              Innovation
                        Economic Vitality          Redevelopment
                        Infrastructure             Leadership

                       Goals:
                         •   Continue to review traffic survey data to address its impact on traffic flows,
                          quality of streets, capacity of streets, adequate and proper signalization and air
                          quality.
                         •   Assess every street on an annual basis through the street inventory program.
                         •   Provide Engineering Division with a list of CDBG & Reconstruction streets each
                          year.
                         •   Maintain streets in a condition which allows efficient and safe travel by the
                          public.
                         •   Perform the correct maintenance at the proper time in the streets life cycle.
                         •   Expand the practice of utilizing Tarrant County employees to assist with the
                          asphalt overlay of thoroughfare streets in Hurst.
                         •   Conduct traffic studies to maintain an accurate record of traffic volumes (on
                          major roadways).
                         •   Consider major arterial improvements as traffic volumes approach their
                          capacity.















                                                             241
   253   254   255   256   257   258   259   260   261   262   263