Page 257 - Hurst FY19 Approved Budget
P. 257

PUBLIC WORKS

                                                    110 GENERAL FUND
                                                 0664 STREETS / DRAINAGE






                       MISSION STATEMENT


                       To perform maintenance of streets and traffic control systems in a
                       professional manner that will provide safe and efficient movement

                       of traffic on streets and develop and implement comprehensive
                       transportation plans that are efficient, safe and environmentally
                       friendly.



                       DIVISION DESCRIPTION


                       The Street Division is responsible for maintaining 148 miles of paved concrete and
                       asphalt streets throughout the City with various types of repair methods such as overlay,
                       micro-resurface, patching and crack sealing. The Traffic Control Section maintains 7,795
                       traffic control devices, such as signs and markings, in addition to 41 signals. This section
                       also performs traffic counts for speed & warrant studies. They also respond to all citizen
                       complaints and related street, drainage & traffic emergencies that arise.


                       PRIOR YEAR RESULTS & ACCOMPLISHMENTS


                         •   Overlaid a total of 7.9 lane miles of road surface.
                         •   Crack sealed a total of 70,000 sq. yards of roadway surface.
                         •   Contractors replaced a total of 1497 feet of curb and gutter, 310 feet of
                          sidewalk, 24 driveways, and 14.5 valley gutters.
                         •   Daily monitoring of the ACTRA traffic signal and remote control system.
                         •   Replaced all street name signs in the City with new Hurst Logo and reflective
                          material that were damaged by inclement weather or vandalized.
                         •   Monitored traffic signal timing plans throughout the city.
                         •   Program, troubleshoot, and maintain 24 School flashers.


                       FUTURE INITIATIVES


                         •   Overlay a total of 7 lane miles of road surface with asphalt.
                         •   Crack seal a total of 80,000 sq. yards of roadway surface.
                         •   Manage contractors for the Surface Drainage Program replacement of curb
                          and gutter, sidewalk, handicap ramps, driveways, and valley gutters.







                                                             240
   252   253   254   255   256   257   258   259   260   261   262