Page 162 - Azle City Budget 2019
P. 162

DEPARTMENT                                 UTILITY FUND                                   ACCOUNT
            Utility Maintenance                                                                           02-506

            PURPOSE STATEMENT:
            Our mission is to provide a higher quality of life in Azle by the continuous delivery of potable and palatable water
            at adequate pressure and the safe transportation and delivery of the all wastewater from point of use to the
            wastewater treatment plant.






            GOALS AND OBJECTIVES:

            Decrease water quality complaints in the water distribution system by 5%.
            Rehabilitate one-(1) Lift Station. Electrical control panels, guide rail systems, and internal plumbing
            Reduce complaints regarding sewer backups by 5%.
            Reduce manual meter reading mistakes by 5%
            Replace 500' of 2" water mains in the distribution system.









            KEY POINTS OF PROPOSED BUDGET:
            Personnel Services:  Increase due step increases, 3% cost of living adjustment, and increase benefit costs.
            Supplies:  Increase requested for various field supplies.
            Maintenance:  Increase requested to continue slip line system repair program.
            Capital Outlay:  Increase requested for the purchase of additional SCADA equipment and water meters for new
                development.











            KEY INDICATORS OF PERFORMANCE:                                         FY 16-17 FY 17-18 FY 18-19
                                                                                     Actual   Estimate  Projection

            Total wastewater calls                                                    121       115       109
            Percent reduction of total wastewater calls                             -10.00%   -4.90%     -5.00%
            Total Water Quality Complaints                                            37         33        31
            Percent reduction of Water Quality Complaints                           89.00%    -10.80%    -5.00%
            Total Meter reading mistakes (avg. total meters 66,012)                   210        20        10
            Percent reduction of Meter reading mistakes                             -39.50%   -90.40%   -50.00%
            Total footage of wastewater mains replaced.                              1,570     1,572     1,653
            Total footage of water lines replaced.                                    542       350       500








            City of Azle 2018-2019 Budget                                                                     150