WASTEWATER UTILITIES DEPARTMENT
                       WASTEWATER COLLECTION DIVISION (200-750-80)




                DEPARTMENT DESCRIPTION:
                The Wastewater Collection Division is responsible for operating and maintaining the facilities necessary to serve the
                City's residential, commercial and industrial wastewater customers. This includes facilities for collecting and
                transporting wastewater from the point of origin to the main interceptor line (Trinity River Authority), while providing a
                safe and healthy environment. Duties of the division also include maintenance of lift stations, wastewater manholes,
                mains and services, and installation of new wastewater mains, taps and services.

                DEPARTMENT/DIVISION GOALS:
                1. Perform necessary maintenance and repairs to wastewater mains and services, manholes, lift stations, and related
                facilities throughout the collection system in order to minimize any disruption of service.
                2. Repair breaks and defects in wastewater mains and service lines.
                3. Install wastewater service lines (sewer taps) as required for new customers.
                4. Perform routine maintenance cleaning of wastewater lines to minimize service interruptions.
                5. Inspect, repair, and maintain lift stations in good working condition.
                6. Maintain, inspect, repair, and replace wastewater manholes.  Collect GPS coordinates.
                7. Locate City-owned wastewater lines for contractors and excavators.
                8. Conduct internal CCTV pipe inspections of wastewater mains and services to assess the physical condition and
                identify sections in need of repair or replacement.
                DEPARTMENT/DIVISION OBJECTIVES:
                Initiate a lift station preventative maintenance and rehabilitation program.

                SERVICE LEVEL ANALYSIS:
                                                                                        FY 2018-19
                                                    FY 2016-17   FY 2017-18   FY 2017-18   Adopted
                SERVICES PROVIDED                     Actual      Budget     YE Proj.     Budget
                Total miles of wastewater mains maintained  202    208         208         212
                Total miles of wastewater mains cleaned  38.8      50.0        36.0        35.0
                Total miles of wastewater lines video
                inspected                               9.4         5.0        3.4         3.5
                Work orders completed                  1,074       1,000       800         800
                Sewer manholes maintained              3,264       3,350      3,400       3,500
                Sewer manholes inspected               125         120         172         150
                Lift stations maintained                6           6           6           6
                Sewer taps installed                    4           3           2           3
                Line locates performed                 254         200         292         250
                # of wastewater main line blockages    N/A         N/A          10          8
                # of active wastewater customers on
                September 30th                        13,325      13,400      13,425      13,500

                PERFORMANCE INDICATORS
                % blocked mains cleaned w/in 24 hrs      -          -           -         100%
                % WW lines cleaned as scheduled          -          -           -         100%