Page 14 - CityofLakeWorthFY26AdoptedBudget
P. 14

INFRASTRUCTURE PLANNING & MAINTENANCE, CONT.









      Water and Sewer Infrastructure Improvements



      The  FY  2026  budget  also  supports  critical  upgrades  to  the  City’s  water  and

      wastewater infrastructure, addressing aging lines and increasing system reliability:
           Shawnee Trail Water & Sewer Line Upgrades – Replacement and enhancement

           of  aging  utility  lines  along  Shawnee  Trail  to  improve  service  reliability  and

           reduce the risk of system failures.
           Rench Road, Caribou Trail, and Telephone Road Utility Extensions – Installation of new
           water  and  sewer  lines  to  support  growth  and  create  system  loops,  improving  water

           pressure and redundancy.
           Marina Lift Station Reconstruction – Comprehensive reconstruction of the Marina

           Lift  Station,  including  the  installation  of  a  new  generator,  to  ensure

           uninterrupted wastewater service during power outages.
           14-Inch  Force  Main  Upgrade  –  Replacement  and  upsizing  of  the  force  main

           pipeline from the Marina Lift Station to Charbonneau Road, increasing capacity
           and flow efficiency.

           Backup Power Installations – Generator installations at both the Azle Well Site

           and the Stadium Water Tower Site to enhance system resiliency during weather-
           related emergencies or electrical disruptions.




      These improvements demonstrate the City’s commitment to infrastructure resiliency,
      public  safety,  and  quality  service  delivery.  The  FY  2026  budget  ensures  that  Lake

      Worth remains well-positioned to meet the demands of a growing community while

      maintaining its infrastructure assets responsibly.


















                                                                                                                    7
   9   10   11   12   13   14   15   16   17   18   19