Page 14 - CityofLakeWorthFY26AdoptedBudget
P. 14
INFRASTRUCTURE PLANNING & MAINTENANCE, CONT.
Water and Sewer Infrastructure Improvements
The FY 2026 budget also supports critical upgrades to the City’s water and
wastewater infrastructure, addressing aging lines and increasing system reliability:
Shawnee Trail Water & Sewer Line Upgrades – Replacement and enhancement
of aging utility lines along Shawnee Trail to improve service reliability and
reduce the risk of system failures.
Rench Road, Caribou Trail, and Telephone Road Utility Extensions – Installation of new
water and sewer lines to support growth and create system loops, improving water
pressure and redundancy.
Marina Lift Station Reconstruction – Comprehensive reconstruction of the Marina
Lift Station, including the installation of a new generator, to ensure
uninterrupted wastewater service during power outages.
14-Inch Force Main Upgrade – Replacement and upsizing of the force main
pipeline from the Marina Lift Station to Charbonneau Road, increasing capacity
and flow efficiency.
Backup Power Installations – Generator installations at both the Azle Well Site
and the Stadium Water Tower Site to enhance system resiliency during weather-
related emergencies or electrical disruptions.
These improvements demonstrate the City’s commitment to infrastructure resiliency,
public safety, and quality service delivery. The FY 2026 budget ensures that Lake
Worth remains well-positioned to meet the demands of a growing community while
maintaining its infrastructure assets responsibly.
7