Page 380 - CityofKellerFY26AdoptedBudget
P. 380

FY 2025-26 KELLER FEE SCHEDULE



            Water/Sewer Service Tap and/or Meter Install   Actual cost as determined on a case by case basis by the Director of Public
            (Outside City Limits)                        Works based on actual costs and impact to the system.


            Street Lights                                $10.50 per month per pole (maximum of 24 months)

            Sanitary Sewer Camera Fee                    $225 each – per residential building permit

            Old Town Keller Asphalt Parking              •   Existing buildings/facilities – actual cost of materials

                                                         •   New buildings/facilities and existing buildings/facilities with privately
                                                         funded improvements exceeding $50,000 – no cost
                                                         Public parking space construction scope and schedule to be at the discretion
                                                         of the Department of Public Works and dependent upon the availability of
                                                         funding as determined by the City

            Miscellaneous right-of-way encroachment, dedication  $100 each
            or abandonment

            Miscellaneous easement dedication or abandonment  $100 each


            Plat (Preliminary, Final, and Amended)       $300 per application plus $20 per lot residential (exceeding one lot); $250
                                                         per application for single residential lot
                                                         $300 per application plus $20 per acre for non-residential

            Replat                                       $350 per application for a single lot
                                                         $400 +$20/lot (exceeding one lot)

            Minor Subdivision Plat                       $300+$20/Lot exceeding one lot

            Major Subdivision Plat - Residential         $500+$20/Lot exceeding one lot

            Major Subdivision Plat - Non-Residential     $500+$20/Acre

            Vacation of Plat                             $200

            Planned Development                          $700 for planned development

            Planned Development Amendment                $400 +$10/Acre

            Future Land Use Plan Amendment               $500 per application

            Thoroughfare Plan Amendment                  $250 per application

            Specific Use Permit                          $350 residential
                                                         $500 commercial

            Rezoning Application                         $500








                                                            378
   375   376   377   378   379   380   381   382   383   384   385