Page 176 - Microsoft Word - FY26 Budget Book Intro
P. 176

FY 2025-26 ADOPTED BUDGET


              Mission Statement


              To  minimize  wastewater  collection  service  interruptions,  ensure  wastewater  collection  system
              infrastructure integrity and monitor wastewater quality prior to entering the Fort Worth and Trinity
              River Authority wastewater collection system.

              Division Description

              The Wastewater/Environmental Division is responsible for the maintenance and operation of the
              City’s wastewater collection system, which consists of approximately 155 miles of sanitary sewer
              lines,  3,008  manholes,  and  278  clean  outs.  The  Wastewater/Environmental  Division  ensures
              the  City’s  compliance  with  federal  wastewater  discharge  limitations,  implementation  of  the
              Sanitary  Sewer  Overflow  Initiative,  monitors  high  strength  wastewater  customers,  manages
              Grease  Hauler  Registrations,  the  Vector  Control  Program,  Backflow  and  Cross-Connection
              Programs, and assists with implementation of the city's Storm Water Management Program.


              Prior Year Accomplishments

                    Completed  4  Household  Hazardous  Waste  Collection  events  disposing  of  over  40,000

                     pounds of hazardous materials
                    Completed and submitted the Sanitary Sewer Overflow Initiative report to TCEQ
                    Sampled 165 commercial and industrial sites reducing Fort Worth wastewater treatment
                     costs
                    Completed 92 miles of sewer main cleaning, root control and chemical treatment for fats,
                     oils, and grease as part of the Sanitary Sewer Overflow
                    Registered and monitored 241 commercial grease accounts


              Future Initiatives


                    Complete the required sanitary sewer cleaning and root treating as stipulated in the
                     EPA/TCEQ’s Sanitary Sewer Overflow Initiative
                    Chemically treat 8 miles of problematic sanitary sewer mains for grease
                    Perform internal video inspection of 7,000 linear feet of sanitary sewer mains
                    Rehabilitate the Service Center environmental chemical storage room

                    Successfully propose for approval to enter an agreement with the City of Fort Worth to
                     facilitate and manage an Industrial Waste Pretreatment and Monitoring Program

















                                                            175
   171   172   173   174   175   176   177   178   179   180   181