FY 2025-26 ADOPTED BUDGET


              Mission Statement


              To provide for effective administration of Public Works activities that ensures safe and efficient
              storm drain systems and to ensure that all City public drainage improvements are designed and
              constructed  in  accordance  with  City  regulations  and  accepted  engineering  and  construction
              principles and practices.

              Division Description


              The Engineering Division of the Public Works Department is responsible for the overall engineering
              and construction of streets and drainage facilities.  The Engineering Division is responsible for
              reviewing and/or preparing construction plans, issuing permits, and inspecting new construction
              of all street and drainage systems. The Engineering Division also prepares long range planning for
              street and drainage improvements.  The Geographical Information System (GIS) staff within the
              Engineering Division prepares and maintains a storm drain system inventory and updates all storm
              drain maps.

              Prior Year Accomplishments


                    Complete Lead and Copper Rule Revisions (LCRR) service line inventory and submit to TCEQ
                     prior to October 16, 2024

                    Develop program to meet LCRR requirements having to do with required communications
                     to customers and required sampling at childcare facilities and elementary schools
                    Design and construct Precinct Line Road water main adjustments at Harwood Road and
                     Cannon Drive
                    Award bid and begin constructions on the Mary Drive 0.75-million-gallon elevated storage
                     tank

                    Completed detailed design for construction on 2025 sanitary sewer replacements project
                    Completed detailed design for construction on 2025 water main replacements project

              Future Initiatives


                    Design water pump station No. 2 ground storage tanks and pump station rehabilitation
                    Award contract and begin construction of 2025 water main replacements
                    Award contract and begin construction of 2025 sanitary sewer replacements project



















                                                            169