FY 2025-26 ADOPTED BUDGET
Mission Statement
To provide for effective administration of Public Works activities that ensures safe and efficient
storm drain systems and to ensure that all City public drainage improvements are designed and
constructed in accordance with City regulations and accepted engineering and construction
principles and practices.
Division Description
The Engineering Division of the Public Works Department is responsible for the overall engineering
and construction of streets and drainage facilities. The Engineering Division is responsible for
reviewing and/or preparing construction plans, issuing permits, and inspecting new construction
of all street and drainage systems. The Engineering Division also prepares long range planning for
street and drainage improvements. The Geographical Information System (GIS) staff within the
Engineering Division prepares and maintains a storm drain system inventory and updates all storm
drain maps.
Prior Year Accomplishments
Complete Lead and Copper Rule Revisions (LCRR) service line inventory and submit to TCEQ
prior to October 16, 2024
Develop program to meet LCRR requirements having to do with required communications
to customers and required sampling at childcare facilities and elementary schools
Design and construct Precinct Line Road water main adjustments at Harwood Road and
Cannon Drive
Award bid and begin constructions on the Mary Drive 0.75-million-gallon elevated storage
tank
Completed detailed design for construction on 2025 sanitary sewer replacements project
Completed detailed design for construction on 2025 water main replacements project
Future Initiatives
Design water pump station No. 2 ground storage tanks and pump station rehabilitation
Award contract and begin construction of 2025 water main replacements
Award contract and begin construction of 2025 sanitary sewer replacements project