Page 121 - Microsoft Word - FY26 Budget Book Intro
P. 121
FY 2025-26 ADOPTED BUDGET
Division Description
The Street Division is responsible for maintaining 148 miles of paved concrete and asphalt streets
throughout the City with various types of repair methods such as overlay, seal coat, patching and crack
sealing. The Traffic Control Section maintains 41 signals and 7,795 traffic control devices, such as signs and
markings. This section also performs traffic counts for speed and warrant studies. This division also responds
to all citizen complaints and related street, drainage & traffic emergencies that arise.
Prior Year Accomplishments
Overlaid 2.4 lane miles of road surface
Crack sealed 6.9 lane miles of roadway surface
Seal coated 7.9 lane miles of asphalt roadway surface
Monitored timing plans for 53 signalized intersections
Programmed, troubleshot, and maintained 29 school flasher signals
Replaced one signal cabinet at NE Mall Blvd @ The Shops
Camera detection system replacement at NE Mall Blvd @ The Shops
Future Initiatives
Overlay 5 lane miles of road surface with asphalt
Crack seal 20 lane miles of roadway surface
Seal coat 7 lane miles of asphalt roadway surface
Replace faded or damaged signs and posts as needed
Manage annual $250,900 concrete contract for replacement of damaged curb & gutter, sidewalk,
handicap ramps, driveways, and valley gutters
Replace 3 controllers with circuit boards in traffic cabinets 10+ years old
Replace faded regulatory and street signs on signal mast arms at 23 intersections for improved
visibility/reflectivity
120

