Page 319 - CityofGrapevineFY26AdoptedBudget
P. 319

WATER UTILITY ENTERPRISE FUND
                 FY2025-26
                 ADOPTED OPERATING BUDGET
                 FUND SUMMARY 200-155, 200-125 AND 201-155











       FOCUS AREA(S)
       High Service Levels/Quality of Life,Infrastructure



       DEPARTMENT DESCRIPTION
       The Utility Enterprise Department is responsible for providing a safe and convenient public thoroughfares and storm
       water control, the Department is also responsible for providing a safe and adequate supply of drinking water and
       wastewater treatment by the operation of water treatment and storage facilities and the wastewater plant, in compliance
       with state and federal regulations. In addition, the Department provides for the accurate and timely reading of water
       meters. Within the Utility Enterprise Fund is the Water Distribution, Water Treatment, Utility Billing, Wastewater
       Collection, Wastewater Treatment, Administrative Services and Permanent Capital Maintenance Division.



       MISSION STATEMENT
       Provide high quality, safe drinking water, wastewater treatment and recycled water services to present and future
       customers; Deliver uninterrupted services in a cost-effective, efficient and sustainable manner.



       FY25 DEPARTMENT ACCOMPLISHMENTS
       Awarded design contracts for:
          Water treatment plant filters to include PFAS water modeling.
          Water Treatment plant administration building upgrade and renovation.
          Wastewater Treatment plant administration building upgrade and renovation.
       Installed 2500 automated meters throughout the distribution system.
       Installed 10 permanent pressure loggers and updated water model.
       Upgraded Hilton lift station with new pumps and electrical Main Control Center.
       Selected Construction Manager at Risk for both Treatment plants.



       FY26 DEPARTMENT GOALS AND OBJECTIVES
          Establish and implement new water/wastewater rates for the next 10 years.
          Begin construction of Admin Buildings at Treatment Plants.
          Install 2,500 automated meters throughout the distribution system.










                                                             314
   314   315   316   317   318   319   320   321   322   323   324