PUBLIC WORKS
                 FY2025-26
                 ADOPTED OPERATING BUDGET
                 100-155











       FOCUS AREA(S)
       Safety and Security, Transportation, High Service Levels/Quality of Life, Infrastructure,



       DEPARTMENT DESCRIPTION
       The Public Works Department is responsible for reviewing construction drawings for private and capital improvement
       projects and monitoring of construction related activities, providing safe and convenient public thoroughfares and storm
       water control. It also provides for the safety of vehicular and pedestrian traffic through the installation, maintenance, and
       repair traffic control devices and maintains vehicles and equipment to the highest standards of safety and efficiency. It
       protects environmental quality and provides for the accurate and timely reading of water meters. The Department
       provides a safe and comfortable working environment for all employees and visitors in City facilities. Within the Public
       Works Department is the Administration, Engineering, Streets, Traffic, Environmental Services, Facilities and Fleet Services
       Division.



       MISSION STATEMENT
       The Public Works Department is dedicated to ensuring that the infrastructure of the City is constructed and maintained to
       the highest standard to protect the health, welfare and safety of the citizens and visitors of Grapevine. Our commitment
       is to be responsive and courteous while being committed to providing outstanding service to provide a great value to the
       Community.



       FY25 DEPARTMENT ACCOMPLISHMENTS
          Completed planning, design and construction of Fairway Drive and bid project
          Completed the installation of the traffic signal at Kubota and Grapevine Mills Boulevard North.
          Completed regrading and rebuilding of culverts and driveways on Forrest Hills, Ridge and Lakeridge to help with
          flooding issues.
          Continued design for the buildings at the Water Treatment and Wastewater Treatment Plants and Water Treatment
          Plant improvements.
          Installed 2,500 automated meters throughout the distribution system.
          Upgraded the Hilton Lift Station with new pumps and motor control centers.
          Completed emergency repair for Denton Creek water line crossing.