Page 87 - CityofEulessFY26AdoptedBudgetOrdinance2432
P. 87
FY2025- 26 INFRASTRUCTURE PLAN
STREET MAINTENANCE PLAN
Street maintenance includes material and labor for pavement surface and sub grade
repair, curb and gutter replacement (as needed), manhole and water valve adjustments,
driveway approach repair ( as needed) and other miscellaneous items associated with
specific locations.
The maintenance list and methods employed will be based on the IMS ( Infrastructure
Management Services) street condition study as well as staff' s knowledge of street
conditions.
SIDEWALK PLAN
Sidewalk construction includes material and labor for sidewalks, barrier free ramps where
necessary, short concrete paver retaining walls where necessary and other
miscellaneous items that may exist at specific locations.
STREET LIGHT PLAN
The street light plan includes roadway illumination on arterial and collector streets to
enhance pedestrian and vehicular safety during night and low light conditions. Street light
installation may include underground installation of power sources to lights, concrete
foundations, and poles. Where possible the use of existing power poles will be utilized.
New and/ or additional street lights on residential streets are not addressed or included in
this plan but are reviewed on a case by case basis.
SIGNAL PLAN
The Traffic Signal Plan includes traffic signals and flashing school zone signs located
throughout the City of Euless. The items included in the plan are upgrades to signal
controllers, upgrades to signal heads, upgrades to video detection, replacement of
antiquated flashers and other miscellaneous related items. The addition of GPS ( Global
Positioning System) protocol for preemption is also now included City-wide.
2- 7
Ordinance No. 2432, Page 81 of 474