Department: PUBLIC WORKS Date Prepared: March 20, 2025
Submitted By: MAJOR JONES Date Completed:
Project Title: 52ND CDBG LINE REPLACEMENT — MARTIN/ SLAUGHTER/ E HUITT
WASTEWATER
Project Type: Sub -Type: MAIN REPLACEMENT
A
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/ OR MASTER PLAN:
The wastewater mains included in this project are part of the City' s Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Martin Lane from Huntington Drive to American Boulevard,
2. Slaughter Lane from Huntington Drive to American Boulevard, and
3. East Huitt Lane from Huntington Drive to American Boulevard.
52nd year CDBG project)
PROJECT SCHEDULE:
FY2025- 26
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/ infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst -first approach to reduce maintenance costs and customer problems.
Ordinance No. 2432, Page 350 of 474