           Department:    PUBLIC  WORKS                                    Date  Prepared:   April  02, 2024
           Submitted  By:   MAJOR JONES                                    Date Completed:
           Project  Title:   CRESTHAVEN  DRIVE RECONSTRUCTION
                          STREET
           Project  Type:                               Sub -Type:  IMPROVEMENTS
                                                                     B
           Project  Code:                               Priority:
           RELATIONSHIP   TO OTHER   PROJECTS   AND/ OR MASTER    PLAN:
           The Master Thoroughfare Plan identifies the various street types within the City of Euless.  These street types include
           residential streets through regional arterials.  The pavement management plan,  through condition assessment,
           provides statistical data and guidance for cost effective maintenance and project planning.











           PROJECT   DESCRIPTION:
           This project includes the reconstruction of Cresthaven Drive from a two- lane asphalt roadway to a 31 foot wide curb
           and gutter concrete street from SH 10 to South Pipeline Road.

           The project scope includes the replacement of an existing 4 inch AC water line and 6 inch PVC water line located
           along Cresthaven Drive between West Euless Drive and South Pipeline Road.






           PROJECT   SCHEDULE:
           FY2028-  29







           JUSTIFICATION:
           The existing asphalt pavement  is deteriorating  and upgrading  to a concrete curb and gutter street will provide an
           improved riding surface,  extend the life of the roadway,  and enhance the appearance of the streets.

           Many water mains throughout the City are 50+  years old.  Most of these lines are cast iron or AC and are susceptible
           to deterioration,  leaks,  contamination,  and damage.  This project is part of the systematic replacement of water mains
           using a worst -first approach to reduce maintenance costs and customer problems.