Page 204 - CityofEulessFY26AdoptedBudgetOrdinance2432
P. 204
City of Euless
Capital Project Request
March 16, 2022
Department: PUBLIC WORKS Date Prepared:
Submitted By: HAL CRANOR Date Completed:
Project Title: LINE REP — CEDAR HILL ESTATES SOUTH PHASE I
Project Type: WASTEWATER Sub - Type: MAIN REPLACEMENT
Project Code: WW2301 Priority: A
COUNCIL AUTHORIZATION:
November 22, 2022: Authorized the City Manager to negotiate and execute an engineering services contract
with Plummer Associates, Inc. for the design of the FY2023 Sanitary Sewer Rehabilitation Project.
May 14, 2024: Awarded Bid No. 018- 23 for the FY2023 Sanitary Sewer Rehabilitation Project to Douglas Dailey
Construction, LLC for the replacement of sanitary sewer mains located in Cedar Hill Estates South and
authorized the City Manager to enter into a contract with Douglas Dailey Construction, LLC.
RELATIONSHIP TO OTHER PROJECTS AND/ OR MASTER PLAN:
The wastewater mains included in this project are part of the City' s Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Along Sunset Drive between Vine Street and South Main Street and
2. Along Henslee Drive between Whitener Road and Sunset Drive.
PROJECT SCHEDULE:
Began Design: December 2022
Design Complete: March 2024
Began Construction: July 2024
Anticipate Construction Complete: July 2025
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/ infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst -first approach to reduce maintenance costs and customer
problems.
Ordinance No. 2432, Page 198 of 474
44