Page 384 - CityofKellerFY25Budget
P. 384
FY 2024-25 KELLER FEE SCHEDULE
Plumbing Permit $100/Permit − misc. plumbing (water heater/gas line to pool/spa)
*Only charged when no building permit is issued for construction
Re-Inspection Fee $50 / for each additional re-inspection
*Only assessed after an inspection fails more than once for the same
violation
Sidewalk/Approach Permit $25
Sign Permit $50 per sign permit
Mural Permit $350 application
Temporary Sign Permit $25 per sign
Pool Permit $500 / in-ground pools
$50 / above ground pools and spas/hot tubs
Solar Permit $100
Temporary Building Permit $50.00
Demolition Permit $50
Network Node (Small Cell) Permit Application Fee $320 per application
Network Node (Small Cell) Right of Way Use Fee $28 per node, per month
Sidewalks / Curb Cut Fees Fees based on actual costs as derived from City’s current miscellaneous
concrete contract, in consultation with and determined by city staff.
Supplemental Plan Review Fee $50 per hour (minimum 2 hours residential and 3 hours commercial). Only
assessed after original set of plans has been reviewed and approved for
construction and changes are made to the plans by the developer/owner/
builder/representative
Irrigation Permit $50 each – residential
$100 each – commercial
Miscellaneous Inspections $50 each
Lost Packet Fee $50 each
Map Printing Fees 11" x 17" = None
22" x 34" = $15
24" x 36" = $15
36" x 48" and larger = $25
Retaining Wall Permit $50
Seasonal Permit $50
382

