Page 58 - FY 2025 Adopted Operating Budget and Business Plan
P. 58

Business Plan                                             Return to Table of Contents





                                           Enhance Regional Mobility

                          Goal 2: Plan, Manage, and Maintain Public Transportation Infrastructure
                           Objective 1: Optimize Effectiveness and Efficiency of Existing Transportation System
                          Project                  Performance Measure(s)                 Department(s)
             ERM   Airport Layout Plan with   Total Aircraft Operations        Transportation
             2.1.6  Narrative Update
             Summary:

             The current Airport Master plan was adopted by City Council in 2015. Since that adoption operations and interest in the
             Airport have significantly increased. Additional development on the Airports Western Perimeter is continuing to progress
             faster than the previous Master Plan was designed for. TxDOT Aviation is providing a grant for an update to the Airport
             Layout Plan as well as a narrative update focused heavily on operations forecasting and West side development.


                      Airport Layout Plan with Narrative Update


                           Bid Release from TxDOT

                                  Aviation


                              Consultant Selection

                            Vendor replacement of
                                 equipment

                       Approval by City, TxDOT, FAA


                                                 6/24                8/24                10/24                     12/24








































             FY 2025 Adopted Budget and Business Plan                                        49                                                                City of Arlington, Texas
   53   54   55   56   57   58   59   60   61   62   63