Major FY 2023-2024 Street Projects


               E. Broad Street/State Highway 360 Intersection - $7,700,000

               This project will provide improvements around the TX-360 intersection necessary to maximize vehicle
               throughput, especially eastbound to northbound movement. Engineers anticipate creating dual-left turn
               lanes on the bridge and extending west is anticipated. Right-of-way acquisition at the southwest corner of
               the intersection will be considered if necessary. Limits may extend west to Cannon Drive and east to
               Holland Road to maximize vehicle throughput. This project will likely utilize asphalt pavement as is
               existing to the west. A traffic signal at Fire Station 3 will be included with this project.


























               N. Main Street to FM 157 Connector - $4,400,000

               The proposed connector is a four-lane undivided roadway that will provide a connection from North Main
               Street to FM 157. This roadway will be located approximately a half mile north of Mouser Way and will
               align with Watson Branch Lane. The connector will reduce traffic volumes along the frontage of Legacy
               High School and at the intersection of Main and FM 157. This project will also eliminate the current
               skewed intersection of Russell Road and FM 157 and will reduce flooding potential of Watson Branch
               upstream of Russell Road.  Design is anticipated to be complete in early 2024 with construction
               anticipated to begin mid-2024.