                                            Capital Project Request

                                                                                                    April 04, 2020
           Department:            PUBLIC WORKS                                 Date  Prepared:
           Submitted By:          HAL CRANOR                                   Date Completed       May 31,  2023
           Project  Title:        LR —  MIDWAY PARK 3RD ADDN PH II &  GREEN HILLS PRK
           Project  Type:         WASTEWATER                  Sub - Type:   MAIN  REPLACEMENT

           Project Code:          WW2202                      Priority:   A
           COUNCIL  AUTHORIZATION:
           January 11,  2022:  Authorized the City Manager to execute an engineering design contract with Wier &
           Associates,  Inc. for the design of replacement sanitary sewer mains.  The estimated expenditure is $ 63,400.
           June 28,  2022:  Awarded Bid No.  009- 22 to Douglas Dailey Construction,  LLC.  for the replacement of sanitary
            sewer mains in portions of Midway Park 3rd Addition and Green Hills Park and authorized the City Manager to
            enter into a contract with Douglas Dailey Construction,  LLC. The estimated expenditure is $ 327,814.





           RELATIONSHIP   TO OTHER PROJECTS AND/ OR MASTER PLAN:
           The wastewater mains included in this project are part of the City's Wastewater System Master Plan.










           PROJECT   DESCRIPTION:
           The project consists of the replacement of the following wastewater mains:

            1.   Between Fayette Drive and Ector Drive from Harwood Road to Lamar Drive,
           2.  Along Donley Drive from a point 1000 feet north of Harwood Road to Harwood Road,  and
            3.  606,  608,  1304,  1306 and 1308 Glenn Drive.





           PROJECT SCHEDULE:
            Began Design:  January 2022
            Design Complete:  April 2022
            Began Construction:  July 2022
            Construction  Complete:  December 2022





           JUSTIFICATION:
            Many wastewater mains throughout the City are 50+  years old.  Most of these lines are clay tile and are
            susceptible to ground movement,  pulled joints, root infiltration,  and deterioration from hydrogen sulfide gas.
            Many are substandard in size and have inflow/ infiltration problems.  This project is part of the systematic
            replacement of wastewater mains using a worst -first approach to reduce maintenance costs and customer